Sea Huntress - 1997 180' 6" FEADSHIP
N/A N/A N/A
€26,750,000 EUR
MY Sea Huntress offers extraordinary levels of comfort thanks to the motor yacht's exceptional build quality and high volume.
This Feadship Yacht has an ingenious and unique design, the work of the world renowned Terence Disdale is the result of his many years of experience and clear understanding of what the owner required to fullfill his extensive cruising program.
With accommodation for fourteen guests in six en suite cabins catered for by up to 14 crew members , this 1997 motor yacht has all the amenities that one would find on a much larger yacht including Touch and Go helipad.
Contact the yacht broker to receive more information or schedule a showing of this stunning 108' 6" motor yacht for sale today!
FULL SPECIFICATIONS
MAIN CHARACTERISTICS
Year: 1997
Length: 55.00m (180ft 5in)
Beam: 9.60m (31ft 5in)
Draft: 3.20m (10ft 5in)
Classification: Lloyds + 100A1 + LMC. MCA Compliant (not current)
Flag: Malta
Gross tonnage: 822 t
Designer: Terence Disdale
Naval Architect: De Voogt Naval Architects
Interior Designer: Terence Disdale
Helicopter capable: Touch and Go
Speed: 12/15 knots (approx)
Range: 5684 nm at 12 knots
Fuel capacity: 104,000 Litres (27,474 US Gallons)
Water capacity: 24,000 Litres (6,340 US Gallons)
Fuel consumption: approx 190 lph (inc. one generator)
MACHINERY
Engines: 2 X CAT 1270 HP
Engine model: 3512 DI-TA
Engine hours: Port: 30743 (March 2024)
Starboard: 30793 (March 2024)
Fuel: DIESEL
Propulsion: PROP SHAFT
Gearboxes: Reintjes WAF 642
Steering: Akerboom Oil bath shafts
Van Voorden 5-blade propellers, 1700 X 1775 mm
Tenjford steering system
Stabilizers: Vosper Model no 80889/3L MKIV with a Quantum power pack QP 20.20
Generators: Two 160 kW Caterpillar 3306
Generator hours: March 2024
Port Generator – Major Overhaul Jan 22 – Total hours 65,866. Since major 21910 hours
Starboard Generator – Major Overhaul Jan 22 – Total hours 66,060. Since major 21383 hours
Shore power: Two Atlas Spa II 75 kva, (new 2014)
Batteries: Six banks Odyssey AGM (new 2012-2013)
Air Conditioning: Heinen & Hopman Chiller plant
Other Machinery
HRP 90 kW (electric) Bowthruster
Bilge Water Filtration: DVZ 500 VC
Fresh Water System:(two) K&R BS-25 Hydrophore pumps, (two) 9 kW 375 I Hubbell Boilers
Two HEM Watermakers
Fuel Separator & Filtration: Alfa Laval MMB 304
Sewage System: Evac / Hamann
Silver lon fresh water system new 2020
ACCOMMODATION
Owners:
The owners suite is on the main deck forward and offers a King sized bed ,full bathroom with
bath and shower , an observation lounge and office with 180 degreee views forward and a walk
in dressing room .
Guest Cabins:
The two aft twins have additional Pullmans. Each Guest Stateroom has an en-suite bathroom,three with bath tubs and two with showers. The Main Salon is full width. The sky lounge on the bridge deck offers plenty of comfortable seating and a large projector. The sundeck offers a Touch and go heli pad, sauna, whirlpool and full bar. There is also a day head with shower.
CREW
She accommodates 14 crew in 6 cabins. A Captain’s cabin on the Bridge Deck, two forward cabins that sleep three crew and three remaining cabins that sleep two.
GALLEY & LAUNDRY EQUIPMENT
Two Miele XXL Combi steam ovens (new in April 2021)
One Miele KM7897 induction cooktop (new in April 2021)
One Miele electric grill (new in April 2021)
Two Foster reach-in refrigerator/freezer
One Miele refrigerator (new in 2021)
One Hoshizaki ice maker
One Miele Dishwasher (new in 2021)
Crew Galley
One Miele microwave
One Miele Refrigerator
One Hoshizaki ice maker
Additional Galley Equipment
One 4 cu. Meter freeze store
One 5 cu. Meter cool store
Two Dumbwaiters
Three Miele washers
Three Miele dryers
COMMUNICATIONS EQUIPMENT
Sailor 900
Full wired / wireless network with Kerio device
Telephone System: Panasonic Digital telephone system
VHF: Icom Marine IC-M323
One Furuno VHF
Four Icom hand held VHF
Two Peplink 4G cell system
Aiphone KB-3 Intercom
NAVIGATION EQUIPMENT
Two Furuno X-Band Radar
Two Raytheon Anschutz STD 20 Gyrocompass
One Anschutz magnetic compass
One Anschutz Kiel Autopilot
One Furuno depth sounder
One Raymarine depth sounder
Two Furuno Nav GP-150 GPS
One Transas chart plotter
Raymarine Wind/Speed Log
Furuno NX700
One JRC doppler log
ENTERTAINMENT EQUIPMENT
Video Equipment
Two TV's in Owner’s area
Four TV's in Guest, Salon, Skylounge, Captain, one Crew
SAT TV: two Seatel TVRO's with arbitrator
Audio Equipment
Two Stereo's in owner’s area
Four Stereo's in guest, Salon, Skylounge, one Crew
Crestron integration in Salon and Skylounge
TENDER & TOYS
6m custom tender with Volvo AD31 Stern drive
Two Seadoo Spark2up waverunners
One seabob
Numerous snorkels and wetsuits
One Narwhal SV-420 solas rescue boat
MiniCompact LSE Aerotecnica Coltri SPA (compressor suitable for BA and Dive bottles).
(Rescue boat and jetskies can be housed on the fore-deck or heli-deck)
DECK EQIUIPMENT
Aft Warping Capstan's: one Steen 23-3-48-2 w/4 shots chain and Pool anchor
Aft Warping Capstan: one Steen 59-9-08 capstan
Anchors: two Pool N 675 kg
Anchor Chain: two eight shot
Atlas carbon fibre crane for sun deck and fore deck
Boat Crane and Davits: one Set Van Driel davits
Akerboom gangway
Swimming Platform: six underwater lights
Finnish dry heat sauna and jacuzzi on sundeck
SAFETY & SECURITY EQUIPMENT
Security Equipment
CCTV System: Panasonic system controller WV CU 360
Monitors: two Tote Vision 17” and one Tote Vision 9”
Fire Fighting Equipment
Fire Control System: Galley, Engine room and Forepeak, CO2 remote activated
Fire Extinguishers: forty two Buckeye – various types
Alarms: Fire Guard monitoring panel by Eltek Marine
Safety Equipment
Life Rafts: four RFD 16-Person (new 2019)
Life Rings: eight
All new life jackets “Challenger 150 and 275” type
EPIRBS: two Fix GPIRB
Flares: Various
Medical Equipment
Inshore “Antibes Medical” kit
Two stretchers
Medical oxygen
Inflatable splint system
Various First Aid kits – MCA approved
REFIT HISTORY
Refit history under current ownership
Winter 2021/2022 - Lloyds special survey no. 5 and various other refit works all carried out by Feadship at their refit facility in Amsterdam, including:
Major overhaul of both generators (carried out by Pon Power NL)
Removal and overhaul of both gearboxes for service (carried out by the manufacturer Reintjes)
Complete withdrawal of both tail-shafts by Akerboom
Check, polish and balance of both propellers
Removal and complete service of both overhead davit cranes for tender launching. (Carried out by Van Driel the manufacturer)
Opening sandblasting and repainting of all sanitary tanks (black and grey water)
Opening sandblasting and repainting of all fresh water tanks
Complete sandblasting of the underwater area of the hull and new paint system applied from Primer coats upward. JOTUN paints
New replacement fire extinguishers throughout the vessel.
Standard survey items such as servicing/testing valves and hull inspections etc… carried out at Feadship by De Vries
In addition following vessel improvements:
Complete new CCTV system added to monitor the vessel security and heliops Panasonic.
Installation of new Sarlink Maritime system for fast internet access
Complete replacement of all the freshwater pipework throughout the yacht with new MEPLA pipe
New boilers and storage tanks for the hot water system
New pump system for the fresh water system
Extension of the helideck to enable more space for a larger helicopter complete new helideck surface and markings added
Strengthening the helideck with additional pillars on the bridge and main deck to spread load of a larger helicopter and meet the current load requirements for HLA under Lloyds
Addition of 2 fuel tanks (1900L each) and a dual pump system for refuelling a helicopter with Jet A1 aviation fuel was added to the Lazarette (manufacturer Sypack Doedijns)
Addition of a Helideck Monitoring system – (supplied by Kongsberg)
Addition of a deionized water system to allow flushing of a helicopter turbine aboard
Addition of a GPU – Ground Power Unit – Suitable for an H135 helicopter was also added to the helideck area.
Helideck lighting and illumination in line with Aviation and Flag requirements
FLAG STATE required helicopter operation to fall as “closely as possible” into line with their commercial code, this meant additional operational safety features were required as follows:
Installation of DIFFs – 3 pop up nozzles for remote activated foam dispensing added to the helideck, a new separate pump system and foam reservoir added to the engine room.
Installation of a NOVAK extinguishing system and a water mist drench system to the lazarette
Replacement and installation of new Steel scupper system for the helideck area.
Additional portable fire fighting systems also purchased for the helideck
New escape ladder made to allow simple access over the top of the bridge to the foredeck.
New fold down railing system around the helideck area to allow quick preparation for heliops and quick reinstallation upon landing
The life raft mountings were also moved further forward to keep clear of the helideck
Full set of tie down points for the helicopter deck were added and a secondary set further forward to allow long distance transport of the helicopter if required.
Professional consultation with Helidecks UK throughout the project. Writing of a vessel specific manual and crew training also supplied.
* The helideck is not a commercial landing area and due to the size of the vessel cannot comply fully, but all efforts were made to ensure this is a safe and viable operational area for a helicopter up to 3T, based on the H135 machine as the most likely.
Please note the vessel returned to Amsterdam in September 2022 for two months this included re-surfacing the helideck under warranty and some paint warranty items
Spring 2021
Complete new galley
Winter 2019/20
Complete repaint of the yacht. Warranty extended to June 2022 extensive replacement of Teak
decks ( foredeck , bridgedeck and swim platform completely renewed ).
Sundeck and main deck partial renewal and recaulk. All decks now have a minimum thickness of 15mm .
Gangway removed and painted, complete hydraulic service in Netherlands by Akerboom.
New PLC control for all aft hydraulics built by Akerboom.
Both windlass’ removed and sent to Steen in Germany for complete rebuild.
Partial sandblasting of the hull and treatment. Antifoul changed to Jotun Imperial.
New Silver Ion water purification system added, with designated additional filtered drinking tap for the crew, to reduce bottled water purchase/use.
New Furuno depth sounder.
New Sailor 900 VSAT.
Two new Furuno Radars.
New Transas Ecdis Computer installed with designated screen.
New 4/5G antennae and PepWave system.
"Pon" ( Dutch Caterpillar agents ) top end overhaul of both main engines. (at approx. 29.000 hrs in Dec 2020)
"Pon" re-alignment of main engine shafts, and replace engine and gearbox mounts (Dec 2020)
Winter 2018/19
"Pon" commissioned to completely overhaul both generators.
Remodel of upper deck bulwark to facilitate easier heliops. Touch and Go helipad able to receive an MD 500. (Feadship quote available for strengthening to carry larger helicopters) .
New Chiller unit for AC installed and all ducts cleaned, new duct heaters installed. New drives and overhaul of all main airhandlers – all carried out by Heinen and Hopman.
New Chiller unit for both the Cool Room and Freezer room carried out by Heinen and Hopman.
Shafts withdrawn for Lloyds – work carried out by Akerboom.
Both the custom tenders painted, engines overhauled and fabrics replaced.
Carbon MOB crane installed on sundeck with bow socket option.
Stabilizers withdrawn and serviced by Quantum approved contractor.
Two new Cobham Sea Tel antennae for Satelite TV.
New carpet and soft furnishings, and additional furniture throughout entire guest accomodation. All fabrics used are aviation standard so they are fire retardant. Mainly from Loro Piana.
New back lit onyx bar and side tables in main saloon.
New projector screen in skylounge.
All cushions and awnings renewed.
New carpet in guest and owner areas.
New electic Roman shades in owner and guest areas.
New linen and towelling throughout.
Winter 2017/18
New throttle system and associated cables to Engine Room installed.
VAT paid in 2018
May 2017
Completed 5-year Lloyd’s Class survey.